Time from sign up till the start of construction was far too long. Paper work took twice as long as the actual house was to be built. Extremely disappointed with the verandah debacle. Believe the costs to fix the verandah were ridiculous as we watched what was done we didn’t think the price charged was appropriate. We do understand that we should have checked the plans before signing but also expected the drafting person would have some common sense and have pointed this out. I mentioned the gable /verandah several times with _______ & _______ and they assured me it was correct. A picture was given to both of what we wanted which clearly showed the large verandah.