On putting forward the original design to Aveling we were told there would be no issues with what was requested. Much time passed before it was advised back to us that the design would not be accepted by the shire due to matters which had to be addressed in the first build at 20B. This was disappointing as the previous experience should have indicated whether or not it would be acceptable
The only thing was the length of time taken to do the brickwork which hd only 1 tradesman involved for an extended time. However the quality of the finished product was such that this turns into a minor point
Cleaning is still required. As I understand it the whole place was to be cleaned and I not sure that this has yet been attended to.